Postring time consumption to Produktion can be limited, if Flushing Method is Forward or Backward:

Valgmulighed Handling
Yes Time consumption are posted as normal
No Time consumption are NOT posted
Yes (Skip Unit Cost) Time consumption are posted with Unit Cost=0

See also

Post to NAV/BC

Reference

JobManager Setup
Stamp Events



This help includes both Dynamics NAV and Dynamics Business Central (BC). All references to NAV applies to both.