Postring time consumption to Produktion can be limited, if Flushing Method is Forward or Backward:
Valgmulighed | Handling |
---|---|
Yes | Time consumption are posted as normal |
No | Time consumption are NOT posted |
Yes (Skip Unit Cost) | Time consumption are posted with Unit Cost=0 |
See also
Reference
This help includes both Dynamics NAV and Dynamics Business Central (BC). All references to NAV applies to both.