Option Description
Time Comsump The calculated net time for each registration, will be the weight when time allocation is performed.
Calculated Time Consump The estimated time for each job task, will be the weight when time allocation is performed.

If the job bundle contains mixed job types (e.g. Production and Job), allocation Time Consumption is used.

It the field Bundle Factor assuming a value, this value will be used as an additional factor in the time allocation.

Example

             TOTAL BUNDLE                (115 minuts)

                Break (10 minuts)

              JOB 1               (95 minuts)

       JOB 2    (30 minuts)

                             JOB 1     (35 minuts)

Bundle Gross Time Break Bundle Net Time
115 10 105

Time Comsump

Formula = ((Job Registration / Total Job Registration) * Bundle Net Time)

Registration (X) Formula Result
JOB 1 95 ((95 / 160) * 105) 62.34
JOB 2 30 ((30 / 160) * 105) 19.69
JOB 3 35 ((35 / 160) * 105) 22.97
Total Job Registration 160

(X) If Bundle Factor is filled in on the job, this is multiplied to the time for job registration.

Calculated Time Consump

Formula = ((Job Registration / Total Calculated Time Consump) * Bundle Net Time)

Calculated Time Consump (X) Formula Result
JOB 1 100 ((100 / 175) * 105) 60.00
JOB 2 30 ((30 / 175) * 105) 18.00
JOB 3 45 ((45 / 175) * 105) 27.00
Total Calculated Time Consump 175

(X) If Bundle Factor is filled in on the job, this is multiplied to the time for job registration.