Option | Description |
---|---|
Time Comsump | The calculated net time for each registration, will be the weight when time allocation is performed. |
Calculated Time Consump | The estimated time for each job task, will be the weight when time allocation is performed. |
If the job bundle contains mixed job types (e.g. Production and Job), allocation Time Consumption is used.
It the field Bundle Factor assuming a value, this value will be used as an additional factor in the time allocation.
Example
TOTAL BUNDLE (115 minuts)
Break (10 minuts)
JOB 1 (95 minuts)
JOB 2 (30 minuts)
JOB 1 (35 minuts)
Bundle Gross Time | Break | Bundle Net Time |
---|---|---|
115 | 10 | 105 |
Time Comsump
Formula = ((Job Registration / Total Job Registration) * Bundle Net Time)
Registration (X) | Formula | Result | |
---|---|---|---|
JOB 1 | 95 | ((95 / 160) * 105) | 62.34 |
JOB 2 | 30 | ((30 / 160) * 105) | 19.69 |
JOB 3 | 35 | ((35 / 160) * 105) | 22.97 |
Total Job Registration | 160 |
(X) If Bundle Factor is filled in on the job, this is multiplied to the time for job registration.
Calculated Time Consump
Formula = ((Job Registration / Total Calculated Time Consump) * Bundle Net Time)
Calculated Time Consump (X) | Formula | Result | |
---|---|---|---|
JOB 1 | 100 | ((100 / 175) * 105) | 60.00 |
JOB 2 | 30 | ((30 / 175) * 105) | 18.00 |
JOB 3 | 45 | ((45 / 175) * 105) | 27.00 |
Total Calculated Time Consump | 175 |
(X) If Bundle Factor is filled in on the job, this is multiplied to the time for job registration.