Allows you to add overhead (additional costs) when posting time consumption to productions.

The overhead are posted by an extra line in the Output Journal.

The overhead are selected by checking all of the following conditions one at a time. The first one which meets the condition is selected:

If Overhead Number is specified, the overhead will be posted on it. Otherwise, the value is taken from the job.

NOTE: If all of the above search fields are empty, overhead are added to ALL registrations.

Work Center No.
Machine Center
Standard Task Code
Item Routing No.
Item Opr. No.
Prod Routing No.
Prod Routing Ref No.
Prod. Line No.
Prod Opr. No.
Overhead Type
Overhead No.
Gross Time
Excl. Break

See also

Post to NAV/BC

Reference

JobManager Job
Work Center
Machine Center



This help includes both Dynamics NAV and Dynamics Business Central (BC). All references to NAV applies to both.